Neuman Aqua was awarded the project management package of the required refurbishment and repair works to be undertaken on the main Myrtha moving floor pool at the University of Hertfordshire. This package consisted of pool liner removal, new membrane reinstated on the walls and floors of the pool, relining the pool gutter channel, amendment to the pool boom ends and floor buffer installation as well as the surround tiling.

Project Highlights
  • Myrtha Pool.
  • Timing System.
  • Modifications and upgrades to pool plant.