Chelsea Barracks Phase 4

Project Type:
Pools, Shared Residential & Hotel
Location:
London, UK

Positioned on the old Chelsea Barracks Site, Neuman Aqua undertook the design and build for Phase 4 for a 25m lap pool, vitality pool with custom stainless steel loungers and air bubblerseats, as well as four heat experience rooms (2 saunas & 2 steam rooms).

Neuman Aqua’s scope consisted of sprayed concrete shells, associated infill, water treatment systems, tiling package including the surround and drainage, mobility hoist, gas detection system and the bespoke heat experience install. The large Vitality pool was also enhanced with a relaxing water wall feature.

The steam rooms consisted of sandblasted stone flooring and honed limestone for the benches and a polished plaster ceiling with under bench LED lighting. The Saunas were finished with natural Aspen timber slats and all the latest technology to the high end consultants specification.

Project Highlights
  • Pyrolave Tiles and Broughton Moor Slate
  • 4 Heat Experience Rooms (female sauna, male sauna, female steam room and male steam room)
  • Imported stone and tiles from Italy
Awards

Commercial Pool Project of the Year 2022 – Pool & Spa Awards

Chelsea P4 Slider Detail 700x480
Chelsea P4 2 Slider Detail 700x480
Chelsea P4 3 Slider Detail 700x480
Chelsea P4 4 Slider Detail 700x480
Chelsea P4 5 Slider Detail 700x480
Prev
Next

You may also be interested in learning about these innovative projects

Are you looking for a streamlined pool, waterpark design-build solution or service and maintenance plan? Neuman Aqua can help.

Get in touch