Bangor Aurora Aquatic & Leisure Complex

Project Type:
Waterparks & Leisure Pools, Indoor
Location:
Bangor, North Down, UK

Neuman Aqua’s role in the development of the Bangor Aurora Leisure & Aquatic Complex for North Down Borough Council began during the early conceptual stages as a part of the client’s design team. Working in support of specialist aquatic architect S&P, Neuman Aqua’s industry product knowledge, combined with their operational awareness and experience in providing specialist design and build installation services, was essential in developing an efficient design that would work in a semi-circular shaped glazed building.

Following an extensive tender process, Neuman Aqua was awarded the design, supply and installation of a signature sidewinder water ride, two body flumes, multilevel play structure, pirate ship and toddler pool features, spa pools and rockwork theming. Neuman Aqua also designed and supplied the steel start towers and support columns, many of which were suspended from the building’s Glulam structural beams.

Project Highlights
  • Completed in 2013, Bangor Aurora Aquatic & Leisure Complex offers Northern Ireland’s only 50m pool and sidewinder.
  • Developing an efficient design that would work in a semi-circular shaped glazed building was critical to the project.
  • The Aurora Splash Leisure Waters features two large flume slides, slides, a wave machine, interactive water features, toddler pool, and pirate ship complete with rockwork theming.
Bangor Aurora NA Slider Detail3 700x480
Bangor Aurora NA Slider Detail4 700x480
Bangor Aurora NA Slider Detail2 700x480
Bangor Aurora NA Slider Detail 700x480
Prev
Next

You may also be interested in learning about these innovative projects

Are you looking for a streamlined pool, waterpark design-build solution or service and maintenance plan? Neuman Aqua can help.

Get in touch