Coral Reef Waterworld
Project Type:
Waterparks & Leisure Pools,
Indoor
Location:
Bracknell, UK
Coral Reef was first opened in 1989 and the aquatic elements had remained nearly identical to the original installation and needed upgrading after 26 years of use. The refurbishment consisted of replacing the two original slides with 5 new ones with a range of different light and sound experiences, all with new filtration. Neuman Aqua was responsible for the design, supply and install of the hydraulics and filtration system for the 2 new iconic rides.
Project Highlights
- New purpose built plant room to service the 2 iconic rides, running alongside the newly refurbished 3 existing rides.
Prev
Next