Littleport Academy Cambridge

Project Type:
Pools, Competition & Hydrotherapy
Location:
Cambridge, UK

Neuman Aqua undertook the design and install of the filtration plant and tiling of a 1.2m constant depth hydrotherapy pool. The scope included internal finishes to the pool including finger grip edge tiles, edge tiles to channel grating and ribbed tiles to access steps, underwater colour change RGB LED pool lights. As well as the supply and install of step handrails, underwater grab rails, pool surround balustrades and pool cover.

Project Highlights
  • 34 degrees constant water temperature.
  • Automatic chlorine dosing and pH correction.
  • UV dosing
  • 1.2 m constant water depth
Littleport Academy NA Slider Detail2 700x480
Littleport Academy NA Slider Detail 700x480
Prev
Next

You may also be interested in learning about these innovative projects

Are you looking for a streamlined pool, waterpark design-build solution or service and maintenance plan? Neuman Aqua can help.