Littleport Academy

Ely, Cambridge

Neuman Aqua undertook the design and install of the filtration plant and tiling of a 1.2m constant depth Hydrotherapy pool.

The scope included internal finishes to the pool including finger grip edge tiles, edge tiles to channel grating and ribbed tiles to access steps, underwater colour change RGB LED pool lights.  As well as the supply and install of step handrails, underwater grab rails, pool surround balustrades and pool cover.

 

Project Facts

  • 34 degrees constant water temperature
  • Automatic chlorine dosing and pH correction
  • UV dosing
  • 1.2 m constant water depth